Business Model Almanac
EPOCH 2026.0 PCF v7.4 snapshot 2026-Q3
Open the atlas.

Umbrella thread

Acquire-to-Retire

  • Acquire-to-Dispose
  • Acquire-to-Decommission
  • Asset Lifecycle Management
  • Plan-to-Maintain

Physical-asset lifecycle: acquire or construct capital assets, operate and maintain them, depreciate and account for them, and dispose at end-of-life.

The constellation

The brass line traces the thread; the lit houses are the category plates it crosses, in process order. 6 steps across 3 categories.

The thread, step by step

  1. Manage Supply Chain for Physical Products Procure materials and services 4.2
  2. Acquire, Construct, and Manage Assets Plan and acquire assets 10.1
  3. Acquire, Construct, and Manage Assets Design and construct assets 10.2
  4. Acquire, Construct, and Manage Assets Maintain assets 10.3
  5. Manage Financial Resources Manage fixed-asset project accounting 9.4
  6. Acquire, Construct, and Manage Assets Manage asset end-of-life 10.4

Signature software

The systems most associated with Acquire-to-Retire, in prominence order. Selection basis and the dated-snapshot policy are on the methodology page.

IBM Maximo

IBM Corporation Enterprise Asset Management

Recognized Gartner EAM leader (Maximo Application Suite).

RANK #1 as of 2026-Q3 ranking basis

SAP S/4HANA

SAP SE Enterprise Resource Planning (ERP)

The large-enterprise manufacturing and finance ERP standard.

RANK #2 as of 2026-Q3 ranking basis

← Back to all threads